Experience

Project Info:
Owner:
Massachusetts Port Authority - Massport

Technology:
Stainless Steel & Miscellaneous Metals

Engineer:
Fay, Spofford & Thorndike

Project Value:
$725,000

Project Highlights:
This was a fast-paced project with a schedule that required keeping one melter online at all times


Download Project PDF

Logan Airport - Parking Lot Ice Melters

The project required shop pre-fabrication of panels and other components to replace the walls of four ice melter cauldrons at Logan airport.  The cauldrons measure 18’ x 5’x 15’ high with radius ends.  Additionally, the stainless steel pipe and pipe headers were all replaced.  This was a fast paced project with a schedule that required that at least one ice melter was online at all times.